Clearing and forwarding at Tanga port
Our Tanga branch clears imports and exports at the port of Tanga and moves cargo to northern Tanzania and neighbouring countries.
- Operated by
- Tanzania Ports Authority
- Channel and berth depth
- 13 m after upgrade
- Cargo handled 2025/26
- About 1.7 million tonnes
- Upgrade cost
- TSh 429.1 billion
About the port of Tanga
Tanga, on Tanzania's northern coast, was first built as a port in 1891. It is one of the three major ports run by the Tanzania Ports Authority (TPA), with Dar es Salaam and Mtwara.
Until recently, ships anchored about 2 km offshore and cargo was brought in by lighter. TPA's government-funded modernisation, costing TSh 429.1 billion, changed that. Phase one deepened the entrance channel and berth from 3 to 13 metres. Phase two rebuilt berths 1 and 2, about 450 metres of quay, so ships now come alongside. A further 300-metre berth is planned.
| Period | Cargo handled |
|---|---|
| July to September 2024 | 333,718 tonnes, 17% above target |
| 2025/26 financial year | About 1.7 million tonnes, 616 ships |
| TPA target for 2030/31 | 4.5 million tonnes a year |
Figures reported by TPA in Daily News (October 2024) and The Citizen (August 2026).
Sources: Daily News [1], Daily News [4], The Citizen [2], TanzaniaInvest [3]
Who uses Tanga
Tanga is placed to serve the northern regions of Kilimanjaro, Arusha and Manyara, the lake zone, and neighbouring Rwanda, Burundi and northern Uganda. A rail siding links the port to the northern rail corridor towards Arusha. Sisal and coffee are traditional exports, and imports include raw materials such as pet-coke and clinker.
Sources: Embassy of Tanzania in Israel [5], Logistics Cluster (DLCA) [6], allAfrica (Daily News) [7]
What our Tanga branch does
- Customs clearance of imports in TANCIS, the TRA customs system: declaration, duty assessment, release.
- Export documentation and clearance.
- Transit declarations for cargo going on to neighbouring countries.
- Trucking from the port to Arusha, Moshi and other northern destinations.
- One team across Dar es Salaam, Tanga and Mtwara, so you can choose the port that suits your cargo.
How clearance at Tanga works
- 1
Send your documents
Share the bill of lading, commercial invoice and packing list by WhatsApp or email, ideally before the vessel arrives.
- 2
We lodge the declaration
We classify the goods, lodge the declaration in TANCIS and give you the duty and tax assessment from TRA.
- 3
Duties paid, cargo released
Once duties are paid we handle any inspection, shipping-line release and port charges.
- 4
Delivery or onward transit
Your cargo is delivered to you, or moved in transit to its final destination.
Documents you will need
- Original bill of lading
- Commercial invoice
- Packing list
- Importer or exporter TIN certificate
- Certificate of origin, where a preferential duty rate applies
- Permits for regulated goods
Frequently asked questions
Yes. ESTI Logistics has a branch serving the port of Tanga, alongside our head office in Dar es Salaam and our Mtwara branch. We clear imports and exports and arrange transport from the port.
Yes. TPA deepened the entrance channel and berths from 3 to 13 metres and rebuilt berths 1 and 2. Before the upgrade, ships anchored offshore and cargo was moved by smaller boats.
For cargo going to northern Tanzania (Tanga, Kilimanjaro, Arusha, Manyara) Tanga is the nearest sea port, so the road journey is shorter. We can advise which port suits your shipment.
About 1.7 million tonnes and 616 ship calls in the 2025/26 financial year, according to TPA. TPA aims for 4.5 million tonnes a year by 2030/31.
Talk to a clearing agent
Send us your documents or questions. Our team is at 3rd Floor Posta House, Ghana/Ohio Street, Dar es Salaam, with branches serving the ports of Tanga and Mtwara.
Related pages
Sources
Checked 7 November 2026. Rates, rules and transit times change; we confirm the current figures for your shipment when we quote.
- Daily News: Tanga port improvement pays off as number of ships surges (28 Jan 2024)
- The Citizen: Tanga port upgrades trigger capacity boom, dry port push (18 Aug 2026)
- TanzaniaInvest: Tanga port expansion investment (19 Jul 2026)
- Daily News: Tanzania ports performance (19 Oct 2024)
- Embassy of Tanzania in Israel: Tanga port on verge of restoring its pride
- Logistics Cluster (DLCA): Tanzania, Port of Tanga
- allAfrica (Daily News): Tanga port imports of raw materials (Jun 2023)